JDC Tiling ltd.

New Altro installed with new aluminium diminishing Strips to all exposed edges.

Up lift and degrease to Floor

JDC carry out numerous projects and maintenance work for Morrissons, this work needed to be carried out due to the existing Altro floor de-bonding from the existing subbase.  The floor was uplifted, scraped, prepped and degreased. The floor was fiitted with 2mm Altro and All exposed vinyl edges had Aluminium diminishing strips installed.


Morrissons Customer Cafe Prep area

Past Projects......